Study of Strategic Bridges on The National Road Network
Client
financier
Project description
Project scope
The project involved the assessment of 24 No. structures on the National Road Network, the design and preparation of tender documents.
The assignment involved detailed inspection of bridge structures. Design of rehabilitation measures, design for new structures. This also involved materials and geotechnical investigations, topographic surveys, hydrological investigations, tender documentation.