Rehabilitation of Malaba/Busia – Bugiri Road (82.4 Km)

×

Error message

Deprecated function: Optional parameter $conditions declared before required parameter $data is implicitly treated as a required parameter in include_once() (line 1439 of /home/barow6bcmdg2/public_html/gauff/includes/bootstrap.inc).

Client

financier

Project description
Project scope

Rehabilitation and strengthening of 82.4km of Uganda’s main traffic artery.

Activities carried out comprised economic evaluation, road inventory, road condition surveys, deflection measurements, rut depth measurements, bridge and drainage condition surveys, traffic and axle load surveys and pavement strength evaluation and design recommendations, design of several swamp crossings using geogrids and geotextiles.

Further activities consisted of preparation of tender documentation and providing assistance in tender evaluation and award, which was followed by construction supervision, assessment of contractual claims and advice on amicable settlement.

category
Sector
Transportation & urban spaces
map
Location
Eastern Uganda
schedule
Duration
1995 to 2003