Upgrading of Roads in Towns Along Fort Portal-Bundibugyo-Lamia Road (10 KM)

×

Error message

Deprecated function: Optional parameter $conditions declared before required parameter $data is implicitly treated as a required parameter in include_once() (line 1439 of /home/barow6bcmdg2/public_html/gauff/includes/bootstrap.inc).

Client

financier

Project description
Project scope

The Project Roads are located entirely along the newly constructed Fort portal-Lamia Road at four different locations. The existing roads covering a total length of 10 km were constructed to Class 1 bitumen standard with pavement layers of 150mm subgrade(G15), 150mm gravel subbase(G45), 150mm graded crushed stone base and double seal bitumen surfacing (very similar to the pavement thickness of the newly constructed Fort portal-Bundibugyo-Lamia Road. The existing roads envisaged for upgrading were generally narrow with existing gravel material (G15) surface partly washed out. It thus required widening with removal of unsuitable material and placing of approved material at roadbed preparation. 

In the light of the available space and the geotechnical survey carried out on the existing road, the Typical Cross Section had to be modified on most road links for all packages to 5 metres carriage way of design pavement thickness with 1.2-meter side drains on either side and no shoulder

  1. Detailed Engineering Design of the roads including;

road condition assessment, Soils & materials investigations, Traffic studies, Pavement design, Geometric design, Hydrological and Drainage design, Road safety audit, Update of bills of quantities and technical specifications, Update of environmental and social reports, Structural design of drainage infrastructure 

  1. Construction supervision of works to completion 
    Activities included; Monitoring contractor mobilization, approval of method statements & work programmes, verification of Contractor setting out, daily inspection and verification of works, issuance of instructions and clarifications to the contractor, quality control of works and materials, Client liaison, Measurement and certification of works, Financial & Physical progress monitoring and reporting, Cost Control, Assessment of Claims by Contractor, Overall Project & Contract management, Environmental, Social, Health & Safety monitoring and ensuring timely mitigation, Preparation of As-built drawings, Superintendence over the Defects Liability Period
category
Sector
Transportation & urban spaces
map
Location
August 2015 to February 2016
schedule
Duration
Kabarole

More Projects