Feasibility Study and Detailed Engineering Design for The Upgrading of Soroti – Lira Road (123 Km)
Client

financier

Project description
Project scope
The project involved carrying out a feasibility study under Phase I and following which, a detailed engineering design under Phase II for the upgrading to bitumen standards of Soroti – Lira road (123 km).
- Feasibility study for the upgrading of the selected route and route optioneering, developing pavement design options, road safety studies
- Preparation of preliminary designs, proposed implementation plans, schedules; economic & financial analysis
- Full environmental and social impact study, road safety, land acquisition, preliminary design, economic and financial analysis;
- Detailed engineering design for the approved road option; including all necessary data collection, field surveys and analysis to cover all aspects of detailed design; road signage & furniture, roadway design, environmental and Social Impact assessment (ESIA); resettlement action plan,
- Field investigations including; traffic studies & modelling, geotechnical & materials investigations, topographical and cadastral survey, valuation of project affected properties, Environmental and Social Studies, Hydrological surveys
- Preparation of bidding documents including technical specifications, bills of quantities, engineering drawings;
- Provision of Project Management services during project implementation, acting as Client’s agent for the administration management and coordination of the project.