Feasibility Study and Detailed Engineering Design for The Upgrading of Soroti – Lira Road (123 Km)

×

Error message

Deprecated function: Optional parameter $conditions declared before required parameter $data is implicitly treated as a required parameter in include_once() (line 1439 of /home/barow6bcmdg2/public_html/gauff/includes/bootstrap.inc).

Client

financier

Project description
Project scope

The project involved carrying out a feasibility study under Phase I and following which, a detailed engineering design under Phase II for the upgrading to bitumen standards of Soroti – Lira road (123 km).

  • Feasibility study for the upgrading of the selected route and route optioneering, developing pavement design options, road safety studies
  • Preparation of preliminary designs, proposed implementation plans, schedules; economic & financial analysis
  • Full environmental and social impact study, road safety, land acquisition, preliminary design, economic and financial analysis; 
  • Detailed engineering design for the approved road option; including all necessary data collection, field surveys and analysis to cover all aspects of detailed design; road signage & furniture, roadway design, environmental and Social Impact assessment (ESIA); resettlement action plan, 
  • Field investigations including; traffic studies & modelling, geotechnical & materials investigations, topographical and cadastral survey, valuation of project affected properties, Environmental and Social Studies, Hydrological surveys
  • Preparation of bidding documents including technical specifications, bills of quantities, engineering drawings;
  • Provision of Project Management services during project implementation, acting as Client’s agent for the administration management and coordination of the project.
category
Sector
Transportation & urban spaces
map
Location
January 2003 to September 2004
schedule
Duration
Soroti, Lira

More Projects

Partner(s)