Project description
Project scope

The assignment involved the Feasibility Study and Detailed Design for the upgrading of 5 No. road links totalling about 2.5 kms, By-Pass link, Kyaliwajjala Road, First Street, Second Street and Industrial Close. The construction works are to be carried out in two phases, initially Gravel Standards followed by Bituminous Standards. The design posed some challenges in respect of balancing earthworks, given the nature of the terrain, and the existing developments.

  1. Detailed Engineering Design of the roads including; road condition assessment, Soils & materials investigations, Traffic studies, Pavement design, Geometric design, Hydrological and Drainage design, Road safety audit, Preparation of bills of quantities and technical specifications, Tender documentation and assistance, Preparation of environmental and social reports, Structural design of drainage infrastructure 
  2. Construction supervision of works to completion 
    Activities included; Monitoring contractor mobilization, approval of method statements & work programmes, verification of Contractor setting out, daily inspection and verification of works, issuance of instructions and clarifications to the contractor, quality control of works and materials, Client liaison, Measurement and certification of works, Financial & Physical progress monitoring and reporting, Cost Control, Assessment of Claims by Contractor, Overall Project & Contract management, Environmental, Social, Health & Safety monitoring and ensuring timely mitigation, Preparation of As-built drawings, Superintendence over the Defects Liability Period
category
Sector
Transportation & urban spaces
map
Location
Kampala
schedule
Duration
July 2008 to 2011