Design and Build of Kira-Matugga Road and Improvement of 5 No. Junctions
Client


financier

Project description
Project scope
The project comprises the following components;
- Kira-Kasangati-Matugga road (16km)
- Kira-Kyaliwajjala link (2Km)
- Najjera- Buwaate Spur (5Km)
- Junction Improvements for Mpererwe, Kitetika, Gayaza and Erisa
- On and Off Ramps at Najjera Overbridge
- Half Diamond Interchnage at Namugongo Overbridge
- Pedestrian Bridge at Mpererwe and Buwaate
- Kyaliwajjala Underpass
- Signalisation of junctions at Kyaliwajjala, Kira, Kasangati and Matugga
Gauff conducted the detailed engineering design of the roads, pedestrian crossings, one vehicular overpass, drainage structures and junctions to be built by the Contractor with approval from the Client.
Roads were designed to be upgraded to minimum Class II paved road.
- Geotechnical and materials investigations
- Topographical surveys
- Geometric design of the roads and junctions
- Pavement design of all roads
- Hydrological & hydraulic survey and design to accommodate floods in swampy areas and ensure provision of adequate drainage
- Design of river training and protection works where required
- Traffic studies and modelling for pavement design
- Traffic modelling for design of signalisation systems
- Design of Street Lighting Systems
- Structural design of pedestrian crossings, vehicular overpasses, drainage structures
- Preparation of detailed design drawings and technical specifications